Welcome to www.fasttrackcochin.com  Computer Hardware and Software,A/C,Refrigeration,U.P.S,Stabilizer etc. Servicing for just Rs 150/- in Kochi within ‘2’hours Call : 9388464717, 3297768
BUILDING AND CONSRUCTION
CONTACT US >>

Electrical wiring, Plumbing,

 Carpentry, Mason, Painting,

 Polishing, Borewell , Roofing,

 Marble tiles & Granite  Laying,

 Aluminium Fabrication, Stone

 Design works, Interior Decoration,

 Ceiling , Upholstery,

 Curtains,Mosquito nets, Stainless

 Steel,Cast iron &Brass(Handrails,

 Grills& Gates) Powder & Plastic

 coating , Sign board, Metal Box,

 Gardening, Aquarium, Remote

 control gate system, & Home Lift .

 Advanced technology & Quality for

 water proofing System & Building

 chemical products.

: ALUMINIUM FABRICATION :: FULL QUOTE : PLUMBING : LABOUR : FLOORING : ENGINEERING :

QUOTATION FOR BUILDING CONSTRUCTION WITH LABOUR AND METIRIAL CHARGE

1.

Cleaning the site

 

 

2.

Set outing of the building

 

 

3.

Earth work excavation

m 3

100/-

4.

P.C.C 1:4:8 for foundation 10 cm thick

m 3

1800/-

5.

Random rubble masonry 1:8 for foundation 60 cm ´ 60 cm and basement 45cmx 45cm

m 3

1100/-

6.

Basement filling with excavated earth, red earth and above 10 cm river sand filling

m 3

270/-

7.

R.C.C 1:2:4 C.C for belts of 21 cm width and 10 cm height

m 3

6150

8.

Brick masonry in cm 1:6 for super structure 21 cm thick, height 3 meter

 

2050/-

9.

P.C.C 1:4:8 for flooring 10cm thick

m 3

1900/-

10.

R.C.C 1:2:4 for sunshade, slab, beams and lintels

m 3

6200/-

11.

Plastering of walls 1:5cm and 12mm thick

m 2

85/-

12.

Plastering of ceiling and top surface 1:3cm.

m 2

90/-

13.

R.C.C Eve board

Meter

105/-

RATES FOR LABOUR PLUMBING WORKS JUST CALL 9388464717,3097768

SLNO:

  PARTICULARES

 SIZE

 RATES

1.

G.I pipe

½ - ¾ - 1”

25/-

2.

P.V.C pipe

½ - ¾ - 1”

15/-

3.

G.I pipe concealed

½ - ¾ - 1”

35/-

4.

P.V.C pipe concealed

½ - ¾ - 1”

25/-

5.

P.V.C pipe

1 ¼ - 1 ½ - 2”

25/-

6.

P.V.C pipe concealed

1 ¼ - 1 ½ - 2”

35/-

7.

P.V.C pipe

2 ½ - 3 – 4”

30/-

8.

½ - ¾ - 1”

25/-

9.

Full way valve

½ - ¾ - 1”

40/-

10.

Full way valve

1 ¼ - 1 ½ - 2”

60/-

9.

C.P.V.C pipe concealed

½ - ¾ - 1”

35/-

10.

Wash basin ordinary

 

100/-

11.

Wash basin with trap

 

150/-

12.

Wash basin with pedestal

 

150/-

13.

C.P sink fittings

 

100/-

14.

C.P fittings

 

15/-

15.

Indian closet fittings

 

100/-

16.

Indian closet with high level flush tank

 

150/-

17.

European closet with low level flush tank

 

200/-

18.

Orrisa pan closet with flush tank

 

200/-

19.

Double sephonic closet with flush tank

 

300/-

20.

Wall hung closet with valve

 

350/-

21.

Bidet with fittings

 

300/-

22.

Rubble holes

 

30/-

23.

Concrete holes

 

25/-

24.

Urinal

 

75/-

25.

Bath tub fittings

 

350/-

26.

Brick hole

 

10/-

27.

Soap dish

 

15/-

28.

Towel rod

 

20/-

29.

Motor and pump ½ HP

 

150/-

30.

Water heater

 

75/-

31.

Trench

 

30/-

32.

Flush valve

 

50/-

33.

Bore well

 

1000/-

34.

Mixer valve

 

30/-

35.

Mirror towel road soap dish fittings

 

40/-

36.

Water charge line charging

 

150/-

37.

Gratings fitting

 

30/-

Separate charges for extra items

LABOUR CHARGES

Painting (wall , wood)

190/-

Carpentry

200/-

Polishing (wood)

195/-

Electrician

200/-

Mason

220/-

Plumber

200/-

Quotation for building construction labour charge only

SL NO:

PARTICULARES

UNIT

RATE

1.

Earth work excavation (soil)

100CFT

260/-

2.

Earth work excavation (hard soil)

100CFT

3.

Rubble work

100CFT

600/-

4.

Beam, column (20x22)

1RFT

36/-

5.

Beam, column (35X22)

1RFT

39/-

6.

Beam, column (45x22)

IRFT

41/-

7.

Round column (20cm dia)

1RFT

39/-

8.

Lintel 4”

1RFT

 

9.

Lintel 6”

1RFT

 

10.

Back slab, drop slab

1SFT

18/-

11.

Drop slab (Eve board)

1SFT

18/-

12.

Sunshade, thinslab

1SFT

11/-

13.

R.C.C slabs (max.thickness 4”)

1SFT

11/-

14.

R.C.C slabs, pre-cast slab

1SFT

11/-

15.

Brick work 9”

100SFT

525/-

16.

Brick work 4”

100SFT

375/-

17.

Door, window, ventilator fittings

1NOS

100/-

18.

Wall plastering

100SFT

375/-

19.

Ceiling plastering

100SFT

400/-

20.

Steps for solid concreting (ordinary)

INOS

105/-

21.

Step plastering

1NOS

55/-

Step work (brick work)

1NOS

55/-

23.

Hand rail concreting

1RFT

36/-

24.

Beading/groove

1RFT

6/-

25.

Pins

1RFT

6/-

26.

Hand rail plastering

1RFT

9/-

27.

Slopping roof (small slop)

1SFT

21/-

28.

Slopping roof (angle dd gable)

1SFT

23/-

29.

Manhole

1NOS

100/-

30.

P.C.C (max.thickness-10cm)

1FT 2

5/-

31.

Column footings

1FT 2

21/-

32.

Floor concrete(10cm thickness)

1FT 2

5/-

33.

Cuttings

1RFT

7/-

Aluminium Fabrication

: FULL QUOTE : PLUMBING : LABOUR : FLOORING : ENGINEERING :
:
ALUMINIUM FABRICATION
:

Nos

Particulars

METIRIALS WITH LABOUR

labour

1.

Door

Sft

130/-

25/-

2.

Sliding windows

Sft

110/-

15/-

3.

Open windows

sft

140/-

20/-

4.

Hand rails

Rft

170/-

40/-

5.

Partition

Sft

80/-

10/-

6.

Ceiling (thermocol)

(E board)

sft

20/-

25/-

8/-

10/-

7.

Sitex door

 

1300/-

 

Engineering Works

: FULL QUOTE : PLUMBING : LABOUR : FLOORING : ENGINEERING :
:
ALUMINIUM FABRICATION :

Nos

Particulars

METIRIALS WITH LABOUR

1.

Grills & Gate work Ordinary

Design(ordinary)

Kg

34/-

37/-

2.

Pipe fabrication &aluminium roofing

Light gage

Medium gage

Heavy gage

Labour only

 

 

 

Sq ft

 

 

37/-

42/-

48/-

RATES FOR LABOUR WORK OF FLOORING CALL: 9388464717,3097768

SLNO:

PARTICULARES

RATE

1.

Granite slab border work Rft

20/-

2.

Granite slab laying sq.ft .

20/-

3.

Granite Tiles laying sq.ft .

13/-

4.

Marble Slab Border work and mirror polish sq.ft.

5.

Marble Slab laying and Mirror polish sq.ft.

25/-

6.

Marble Slab laying and ordinary polish sq.ft.

14/-

7.

Marble Tiles laying and Mirror polish sq.ft

22/-

8.

Marble Tiles laying and ordinary polish sq.ft.

12/-

9.

Step and River and skirting R.ft.

D/W

10.

Granite growing R.ft.

D/W

11.

Marble growing mirror R.ft.

40/-

12.

Marble growing ordinary R.ft.

30/-

13.

Marble broken laying and wall polish sq.ft

13/-

14.

Wall and floor tiles laying sq.ft.

5.50/-


NB: 1) water and electricity may be supplied by the owner. 2) Measurements will be taken as per Cochin Corporation rule 3) Amount part-by-part payment as per progress of the work .